Management -v- Governance

Some areas of business seem to be confusing the concepts of organisational governance and effective management to the detriment of both processes. One of the important aspects of ‘good governance’ is to create the environment that allows ‘good management’ to be practiced and to require systems that ensure ‘good management’ is practiced at all levels of the organisation’s management, but governance and management are quite different processes undertaken by different groups of people.

As a basic starting point, Governance is the exclusive responsibility of the Board of Directors, or their equivalent, not management – the governing body (typically Directors) directs and governs; managers manage at various levels.

The three primary levels of involvement are:

  • Governance. The governing Board sets the organisation’s objectives, agrees the strategy to achieve the objectives, define policies and rules for the organisation, requires effective management systems, and also requires processes to be in place to ensure these are implemented by management and to provide effective oversight to the governing body. This is the exclusive non-transferable responsibility of the Board.
     
  • Executive management. The executive’s role is creating the organisation capable of achieving these requirements and providing input and advice to assist the governing body’s decision making processes. Developing an effective culture of openness and accountability is a core executive responsibility.
     
  • General management. Senior and operational management’s roles are to develop and maintain the systems and processes needed to make the organisation effective within the parameters set by the executive. This includes supporting middle and lower management so they can effectively manage the work needed to implement the strategy set by the Board.

For some reason, these different roles are being confused in some business domains, including IT and project management to the detriment of the organisation and the respective disciplines. When a group of managers start referring to ‘normal good management’ practices as ‘governance’, they simply create excuses for bad management practice.

A good example is a project steering committee failing to support a project manager by refusing to make a difficult decision. This lack of support can be defined in two different ways:

  • By claiming the committee is a governance body responsible for ‘governing’ the project, usually interpreted as making sure the project does not do ‘wrong things’, the imperative for a timely decision is removed or hidden, the requirement is no wrong doing which translates into not making a wrong decision. If the project fails as a consequence of the lack of decision, it is called a ‘project failure’ not a governance failure.
     
  • Change the description of the same steering committee to the management entity responsible for the overall creation of value within the organisation based on the work of the project they are overseeing, the situation changes. As the management group responsible for implementing and managing the overall Project Delivery Capability (PDC) needed by the organisation to achieve a positive ROI on its investment in the project, the same failure to make a decision can be seen to have a direct impact on the ROI the managers in the steering committee are personally responsible for achieving. This is a management failure and the managers in the steering committee are directly accountable for the delays caused to the project.

Similar issues to the project management obfuscation described above also attach to calling pragmatic and effective management of IT processes ‘governance’ – data security, backups and recovery capabilities, other IT functions and managing the projects needed to enhance IT are not IT governance issues, they are IT management responsibilities.

My personal view is that if the project and IT management practices described above are determined to be a ‘governance’ function, almost everything in management is ‘governance’, fortunately:

  • No one claims the processes used to make sure the accounts department pay the right people the right amount of money at the right time is a ‘governance’ process – it is seen to be a prudent accounting requirement.
     
  • Similarly no one claims the processes used by the stock department to fill orders with the right goods, and ship them to the right customers is ‘governance’; it is simply a customer service process.

IT and project management should be no different!

The art of good governance is for the Directors to ask the right questions of the executive and have sufficient skills to understand the answers. I do not know of a good resource to help in this respect for IT, however, a really useful (and free) guide to help Board’s ask the right questions of their executive about PDC has been published by the Association for Project Management in the UK, it can be downloaded from: http://www.mosaicprojects.com.au/PDF/APM%20GoPM%20booklet.pdf

Once the Board starts asking the ‘right questions’ and sets a strategic framework my feeling is any executive manager worthy of his/her role will start taking appropriate actions and adapting their organisation. If they don’t the Board probably needs to start asking other questions about the suitability of the executive. However, changing the organisation to achieve effective PDC is a major change program in itself and will need time to be effective……

One short term solution that can be used to kick-start the cultural and organisational changes needed to move to an effective PDC is already in the hands of the governing body and executive. If the organisation cannot find a committed senior manager prepared to take personal responsibility for delivering the value promised by a project do not start the work! We know the lack of effective sponsorship is closely aligned to project failure, so it will be far cheaper and preserve shareholder value if projects without effective sponsors are not started. Conversely, if senior managers are responsible for the delivery of value from the projects they are sponsoring, the key people needed to create effective change in an organisation are already involved and have a vested interest in succeeding.

The important thing to remember is the realisation of value from effective benefits management is very much the end of a process. The overall capability to realise value from an investment in a project starts with selecting the right project to do for the right strategic reasons, then doing the work of the project effectively and efficiently before the organisation can implement the changes and generate value. The project manager is only responsible for the bit in the middle – the ‘doing the project right’, a steering committee, sponsor or other management entity is responsible for the beginning and end parts of the overall process as well as supporting the project team. Therefore PDC has to be seen as a general management responsibility.

The management concepts and framework needed to develop an effective PDC within an organisation have been discussed in earlier posts:

  • The concept of ‘project failure’ -v- ‘management failure’ is discussed in our post Project or Management Failures?.
     
  • Similarly, PDC and the organisational aspects of change have been discussed in length in a series of earlier posts, see:
  • An overview of the management framework needed to achieve effective PDC is in our White Paper: PDC Taxonomy – this White Paper is a conceptual framework not a methodology and is evolving, but should still be helpful in separating ‘governance’ from ‘management’.

These ideas are not new, work by the Boston Group in the 1990s reported in our latest blog, the PDC Value Proposition shows the significant increase in ROI when an effective project delivery capability level is achieved by an organisation.

The governance requirement is to ensure management accepts this responsibility and excel in creating value for the organisation.

Project or Management Failures?

Google ‘reasons for project failure’ and you get nearly 5 million responses! The question this blog asks is how many project failures are caused by project management shortcomings and how many failed projects were set up to fail by the organisation’s management?

The Project Delivery Capability (PDC) framework described in our White Paper Project Delivery Capability (PDC) offers a useful lens to separate the failings generated by project performance from those imposed on the project, inadvertently, or otherwise by organisational management.

The list below separates the root cause of failure into four categories based on this model:

Initiation: failures associated with project identification, business case development, requirements definition and portfolio selection; including establishing initial realistic time and cost budgets based on pragmatic risk assessments.

Project: failures associated with the project team failing to apply effective project management processes as defined in resources such as the PMBOK® Guide, ISO 21500 and PRINCE2

Support: failures associated with the lack of effective senior management support to the project (Capability Support), including inadequate sponsorship, failing to provide appropriate resources, inadequate business inputs, lack of direction/decisions and allowing excessive change.

Benefits: the failure to realise the intended value from the project’s deliverables associated with poor organisational change management, end use adoption and cultural resistance (for more on the overall scope of change see our White Paper, Organisational Change Management).

The table below is based on an amalgamation of dozens of lists found through a Google search.

Reason for FailureCause
Inadequate business case
A good business case will clearly demonstrate the business benefit of delivering a project and define the objectives, requirements and goals.
Initiation
Undefined objectives and goals
This is always a problem, if the organisation does not know what it wants, it is impossible to scope a project to deliver the ‘unknown’.
Initiation
Inadequate or vague requirements
This is only a problem if the organisation fails to allow adequate time and appropriate contingencies in the overall scope of the project to define and firm up requirements. Defined requirements are essential for the project to be able to deliver a successful outcome.
Initiation
Unrealistic timeframes and budgets; unachievable objectives
Fact free planning is always a problem. Initial ‘rough order of magnitude’ estimates need appropriate contingencies in the initial business case. The project outputs need to be feasible.
Initiation
Lack of prioritisation and project portfolio management
Causing competing priorities leading to inadequate support and resourcing for projects.
Initiation
Estimates for cost and schedule are erroneous
Estimates should be based on solid foundations. Unrealistic targets are unlikely to be achieved.
Initiation / Project
Failure to set and manage expectations
Unrealistic expectations are unlikely to be fulfilled. From the start of the initiation through the life of the project effective communication to set and maintain realistic expectations is vital.
Initiation / Project
Business politics
Lack of discipline within executive/senior management. Only present is the organisation is poorly governed and lacks a rigorous portfolio management process. Selected projects should be supported by management.
Initiation / Benefits
Cultural and ethical misalignment
Misalignment between the project team and the business or other organization it serves will inevitably cause problems.
Initiation / Benefits
Lack of a solid project plan
The failure to develop an effective project plan guarantees the project will fail. The type of planning required depends on the project methodology. Some specifics are included below
Project
Poor estimating
Failing to use historical information, formulae, and questions to make sure that the estimate is not a GUESStimate.
Project
Poor processes/documentation
Appropriate processes and documentation are essential for project success.
Project
Poor risk management
All projects are inherently risky. Effective risk management reduces the degree of uncertainty to an acceptable level.
Project
Overruns of realistic schedule and cost estimates
This is a project failing. Either due to poor management/motivation of the project team or poor risk assessment (leading to inadequate contingencies) or poor estimating.
Project
Failure to track progress
Tracking progress against the plan and adapting performance is central to effective project management.
Project
Poor Testing
Failing to adequately test project deliverables; including:
– Poor requirements which cannot be tested
– Failing to design a testable system
– Failing to develop a realistic and effective test plan
– Failing to test effectively with skilled staff
– Inadequate time and budget allowed for testing.
Project
Poorly defined roles and responsibilities
The organisations management is responsible for defining roles and responsibilities in the overall management stakeholder community; the project manager is responsible for the organisation within the project team.
Project / Support
No change control process / Scope creep
A lack of effective change management processes is primarily a project failing, however, organisational management should require effective change management to be in place and support the change management processes.
Project / Support
Team weaknesses – Inadequate / incorrectly skilled resources
Having people who are ill-prepared to complete a task can be worse than not having anyone. The organisation is responsible for providing adequate internal resources for the project, the project is responsible for defined training and procuring appropriate contracted resources.
Support / Project
Lack of user input
The organisation is responsible for organising the necessary input from end users. The project is responsible for requesting and defining its needs and making appropriate use of the information provided.
Support / Project
Lack of management commitment / Lack of organisational support
The organisation is responsible for properly supporting the projects it has initiated.
Support
Ineffective or no sponsorship
Ineffective project sponsorship is almost a guarantee of failure.
Support
Poorly managed – project manager not trained/skilled
The organisation is responsible for appointing an appropriate project manager and providing him/her with appropriate support, training and coaching.
Support
Inflexible processes and procedures, templates and documentation
Any imposed process needs to be as light  as practical to meet the governance needs of the organisation without inhibiting the work of the project.
Support
Insufficient or Inadequate resources / lack of committed resources
(funding and personnel)
The organisation is responsible for properly resourcing the projects it has initiated. If the resources don’t exist or are already fully committed elsewhere, this is an initiation failure; if they are simply not made available it is a support failure.
Support / Initiation
Poor communication / Stakeholder engagement
People tend to fear what they don’t know, therefore effective communication with stakeholders is vital if the project is to capture their support, and keep it. The project is responsible for project based communications; the organisation change manager (sponsor) is responsible for communication in support of the overall change initiative.
Benefits / Project
Poor or ineffective organisational change management
The organisation has to implement, accept and use the project’s deliverables to generate value. Failures at the organisational change level mean most of the planned benefits cannot be realised.
Benefits
Stakeholder conflict
The organisation is responsible for properly supporting the projects it has initiated. This includes the ‘through life’ management of stakeholders starting prior to initiation and continuing through to the realisation of the
benefits.
Benefits
Inability or unwillingness to stop a project after approval
‘Death march’ projects destroy value. A key element of effective portfolio management is to stop wasting money and resources on projects that can no longer contribute value to the organisation.
Benefits

Of the 29 causes of failure outlined above, only 7 are exclusively the province of project management. The other 76% involve or are exclusively the province of the organisation’s general and executive management as part of an overall ‘Project Delivery Capability’!

This overall capability of an organisation to realise value from an investment in a project starts with selecting the right project to do for the right reasons, then doing the work of the project effectively and efficiently, and then making effective use of the project’s outputs to create value. Mess up any of the early stages and there are no benefits to manage. If the organisation fails to implement the changes effectively, the potential benefits are not realised.

The project manager is only responsible for the bit in the middle – the ‘doing of the project’, a steering committee, sponsor or other management entity is responsible for the beginning and end parts of the overall process involved in PDC. Even the 24% of failures assigned to project management have a link back to the role of the Project Director within PDC. The organisation should provide oversight, training and support to ensure effective processes are used by their project managers and teams. Conversely, a skilled project manager may be able to overcome some of the organisational failings identified above; by managing upwards and operating effectively within the organisation’s political systems a skilled project manager can cover some failings, others are fundamental and will result in a failure regardless of the efforts of the project team.

Therefore based on this table, it is reasonable to determine PDC is an executive and general management responsibility. The ‘project governance’ requirement within PDC is for the Board to ensure executive and general management accept this responsibility and excel in creating value for the organisation.

Based on this assessment, my personal feeling is we as project practitioners need to stop referring to ‘project failures’  every time a project fails to deliver the expected value and start talking about ‘business failures’ when the organisation’s  management fails to effectively manage or support the work and as a consequence, fails to achieve the intended/expected value.

PDC Value Proposition

The only reason for undertaking a project or program is to create value through the realisation of benefits. Some projects generate significant intangible benefits such as reduced risk, enhanced prestige or in the case of regulatory requirements, the simple ability to keep trading; others are focused on generating a positive financial return, most generate a combination of financial and intangible returns.

A key element in Project Delivery Capability (PDC) is understanding the value proposition the project or program has been created to generate. Regardless of the way the ‘return’ is measured, no project should destroy value, unfortunately as discussed in Disappearing into the Zone far too many do!

The value proposition for developing an effective PDC (itself a business change program) is compelling. World-wide research undertaken by Jed Simms at the Boston Consulting Group in the 1990s defined five levels of PDC, and found that the return on investment (ROI) from projects increased substantially at each level*. These findings have been developed into a project delivery capability model by TOP – Totally Optimized Projects Pty Ltd

  • Level 1 capability is represented by executive complacency, project teams doing their own thing, no benefits management, and on average projects typically show a small negative ROI but results are wildly variable with some successes (which are always highlighted).
     
  • Level 2 capability sees the imposition of process focused on measuring activity rather than outcomes. The business imposes forms, requirements and check lists; ‘methodology police’ enforce a one-size-fits-all policy. The process of developing ‘approvable’ businesses cases and standardised project reporting creates more uniform outcomes but there’s little understanding of risk -v- reward and virtually no follow through to implementation and benefits realisation. As a consequence there is typically a neutral ROI – the value created eventually covers the costs despite the glowing promises in the business case.
     
  • Level 3 capability sees the organisation gaining sufficient experience and confidence to allow measured flexibility into its processes for managing projects. The basic disciplines are retained, but the way they are implemented is adjusted to suit the needs of the project. The executive view moves from imposing ‘controls’ towards an outcome focus using elements of portfolio management. However, project success still tends to be measured in terms of time, cost and scope at the end of the project rather than the benefits gained by the organisation; an output focus rather than an outcome focus. Organisations at this level generate a reasonable ROI measured at the project level but largely miss the potential for substantially enhanced business outcomes.
     
  • Level 4 capability introduces a paradigm shift in executive thinking. Rather than focusing on project outputs, the work of the project is seen as a key enabler of valuable business outcomes. This requires an integrated flow from the identification of a need or opportunity within the business through to implementing the changes required to deliver of the expected business outcomes to meet the need or exploit the opportunity. Ownership of this value chain is vested in the business, the role of projects and project management is to support this overall effort by delivering the outputs best suited to achieving the business objective. The model defined in PDC = Project Delivery Capability represents the PDC framework needed to support this level. Simms’ research suggests there is an increase in ROI to 2 to 3 times that achieved at Level 3 once the focus of organisation’s executives shift to achieving business related outcomes, measuring the benefits actually realised and the value achieved.
     
  • Level 5 capability expands on Level 4 with the whole PDC system focused on efficiently supporting the strategic objectives of the business. Effective strategic alignment linked to pragmatic risk management and simple but effective processes generates another significant increase in ROI!

Based on observation rather then measurement, it seems the majority of organisations in both the public and private sectors are currently operating at Level 2, typically with the PMO fulfilling the role of ‘methodology policeman’, a few more mature organisations, mainly private sector, are achieving Level 3 maturity whilst others remain at Level 1.

Very few have taken the step to Level 4 where the executive hold their business managers accountable for achieving the outcomes defined in the business case and invest in the PDC capability required to properly support their business managers.

Doing projects ‘right’ is a Level 2 phenomena, doing the ‘right projects, right’ is Level 3; the optimum is Levels 4 and 5 where the right projects are done for the right strategic reasons. PDC was forecast by Simms as the next competitive battleground in 2005 – I would suggest it is the competitive battleground in 2012!

* Source, Project Delivery Capability – the next competitive battleground, Jed Simms, TOP – Totally Optimized Projects Pty Ltd.

PMWT – The end of an era

March 2012 marks the final edition of PM World Today – This valuable publication distributed as a free eJournal to thousands of project managers world-wide filled a valuable space between the heavy academic journals and the more newsy magazines. Over the last 14 years, viewpoints, articles and more serious papers have been published from a wide range of practitioners and academic researchers providing a valuable cross-link between the two groups. Hopefully a replacement publication will emerge.

The closure of PM World Today and the PMForum website brings to a close the work of one of project management’s leading advocates, the late David Curling. PMForum was the world’s first and oldest website devoted to professional project management, created by David in 1994, PM World Today grew out of this as a quarterly newsletter, first published in 1998 and both were David’s passion through to his passing. Editorial control passed to another PM luminary, Hugh Woodward some 7 years ago, and for the last few years to David Pells.

The final editorial of the now monthly eJournal, outlining many of the successes of PM World Today and PMForum can be downloaded from http://www.mosaicprojects.com.au/PDF/PMWT_Final.pdf.  My hope is the rich legacy of materials contributed to the journal and the PM Forum web site may be re-published in the not too far distant future.

In the meantime, there are a couple of free eJournals that may step up to fill the void left by PM World Today, two I have some experience of are:
Project Manager: http://projectmanager.com.au – an independent Australian publication.
Project Accelerator News: http://www.projectaccelerator.co.uk/ – UK based publication supported by Parallel Project Training.

PDC = Project Delivery Capability

My last couple of posts have identified a gap in the overall management of projects and programs that is present in most organisations. This ‘Zone’ covers a range of organisational capabilities from the innovation and assessment of ideas that may develop into projects through to achieving the value the project was created to enable; see: Disappearing into the Zone.

Effective project or program management cannot save a project that has been set up to fail by the organisation. Doing the wrong project ‘right’ or doing the right project as ‘right as possible’ with inadequate funding, resources, skills and management support may reduce the extent of the disaster but cannot prevent failure; see: Cobb’s Paradox is alive and well.

The solution to this perennial problem, first identified by Cobb in 1995, is for the organisation’s leadership to demand that their executive create an effective project delivery capability (PDC). This name is suggested to place focus on the delivery of value to the organisation as a result of doing the ‘right’ projects ‘right’. Managing the selected projects effectively is just one step in this overall value chain.

PDC includes all of the aspects of project delivery discussed in our White paper PPP Taxonomy and outlined above, with a focus on realising value for the organisation.

Implementing an effective and rigorous PDC structure will require a major change effort in many organisations and will challenge existing cultures, particularly the tendency to focus on ‘project failure’ rather than ‘organisational failure’ when the organisation fails to adequately manage the management of its projects. The extent of this challenge is outlined in our White Paper Organisational Change Management.

The three layers of PDC are defined above:

  • Governance the organisations directors / leaders have to set the right strategy, ask the right questions and require the right answers from their executive.
  • Executive management (Purple) are responsible for creating the capability and culture of accountability needed to deliver projects successfully and realise the intended benefits. A key element in this is developing a rigorous portfolio management capability to select the best projects to fulfil the organisation’s strategy, based on consideration of each project’s feasibility and viability, within the organisational constraints of capability and capacity.
  • Organisational support processes (Orange) including opportunity identification and assessment, plus developing and enhancing the organisation’s project delivery capability including: organisational enablers, support systems, oversight systems, change management systems and value realisation.

Program management can fulfil some of these support functions where several projects are being managed in an integrated way to maximise benefits. However, where programs are used by the organisation, the organisation’s overarching support processes need to be capable of supporting and overseeing the work of the programs as well as other independent projects.

PDC reframes the project delivery/success paradigm. Change is needed, the approaches currently used in many organisations are generating project failure rates in excess of 50% and to keep doing the same thing, expecting different outcomes is, to quote Einstein, ‘the definition of insanity’!

Focusing on developing an effective PDC will enable organisations to improve the way they manage the ‘doing of their projects’ and as a consequence increase the success rate resulting in increased value for their stakeholders. The ROI from improving an organisation’s PDC should be significant!

Organisational Change Management

We have just posted a new White Paper that looks at Organisational Change Management. We have focused on ‘organisational’ for two reasons:

  • Firstly, any significant change is a change to the organisation – projects and programs cause the change but the organisation has to adapt to the change.
  • Secondly, the only valid purpose for a change is to create value and the only way to generate value is through sustained improvements (changes) in the way the organisation operates.

This new White Paper, WP1078 Organisational Change Management, consolidates and augments a range of posts over the last couple of years. The full set of original blog posts can be viewed at: /category/governance/change-management