The PMBOK® Guide 6th Edition and its consequences.

One of the key tenets underpinning standards development is the need to continually refresh and update a published standard to maintain its relevance to the market it serves.  The PMBOK® Guide is no different.  The first formal edition of the PMBOK® Guide was published in 1996 and then every four or five years an updated version has been published the sixth edition will be published in 2017.

1996 Presentation Edition

The original concept of the PMBOK® Guide was to provide the knowledge framework need to underpin the PMP examination. This started as a special report published in 1983, with the first PMP candidates sitting for their exam in 1984[1]. The formal guide was first published in 1987. A major revision between 1991 and 1996 led by Bill Duncan resulted in the publication of the book we now know and understand as the PMBOK® Guide.

Each new edition the PMBOK was followed a few months later with an update on the PMP exam so questions being set were based on the current version of the PMBOK® Guide. In addition to these changes caused by updates to the underpinning body of knowledge, the PMP exam itself has evolved over the years. The current exam format of 200 multiple choice questions delivered via a computer-based system originated in the late 1990s.

In 2009 PMI commissioned a global role delineation study (RDS) the PMP credential. This study reached a consensus on the performance domains and the broad category of duties and responsibilities that define the role project manager, as well as the tasks required for competent performance and the knowledge and skills needed to perform those tasks.  This role delineation study became the basis for the structure of the PMP exam in 2011 and whilst it is very similar to the PMBOK® Guide there are some significant differences.  The RDS was most recently updated in late 2015.  Each update to the RDS also triggers a subsequent change in the PMP exam. The change we are now starting to work towards is driven by the impending publication of the PMBOK® Guide 6th Edition – public release date 6th September 2017.

From one perspective updates and changes to the PMP exam have occurred on a routine basis every three years or so for most of the last decade.  Some of the changes were relatively minor, some quite significant.  Based on our preview copy of the PMBOK® Guide 6th Edition the changes in the PMP exam scheduled for Q1, 2018 will be quite significant.

PMBOK® Guide 6th Edition Enhancements

Content Enhancements[2]:

  • Agile practices incorporated into the PMBOK® Guide:
    • Expanded coverage of agile and other adaptive and iterative practices. This will align proven, foundational project management concepts with the evolving state of the profession today. Significant additional detail on agile will be included in an appendix.
    • PMI also plans to publish a companion practice guide focused on agile in the third quarter of 2017.
    • Addition of three introductory sections for each Knowledge Area,
  • Key Concepts, consolidating information fundamental to a specific knowledge area.
    • Trends and Emerging Practices not yet widely used.
    • Tailoring Considerations, describing aspects of the project or environment to consider when planning the project.
    • More emphasis on strategic and business knowledge including discussion of project management business documents.
  • More information on the PMI Talent Triangle™ and the essential skills for success in today’s market

Process Changes

The Process Groups remain the same in the Sixth Edition, although two Knowledge Areas have new names:

  • Project Time Management is now Project Schedule Management, emphasizing the importance of scheduling in project management. This aligns with PMI’s Practice Standard for Scheduling.
  • Project Human Resource Management is now Project Resource Management. We discuss both team resources and physical resources in this Knowledge Area.

There are three new processes in the Sixth Edition:

  • Manage Project Knowledge is part of the Executing Process Group and Project Integration Management knowledge area.
  • Implement Risk Responses is part of the Executing Process Group and Project Risk Management knowledge area.
  • Control Resources is part of the Monitoring and Controlling Process Group and Project Resource Management knowledge area.

Estimate Activity Resources is still part of the Planning Process Group, but it is associated with the Project Resource Management processes instead of the Project Schedule Management processes.

Some processes have been renamed to align the process with its intent. This table identifies the name changes.

Exam Changes

PMP and CAPM

PMP and CAPM exams will change in the first quarter of 2018. We will start updating our CAPM and PMP courses in early September so that candidates planning to take these exams early part of 2018 will have the correct materials to work through as part of their mentored email courses. For more on PMP and CAPM training see: http://www.mosaicproject.com.au/

PMI-SP

The PMI-SP exam is not scheduled for specific change, however, the reference materials used in our PMI-SP courses are based on the PMBOK® Guide and an industry textbook both of which are scheduled to have new editions published in September. We have therefore embarked on the upgrading of this course is our first priority not because the exam is changing, but because all of the references will be out of date when the new versions of the guide and text are published in a few weeks’ time. For more on PMI-SP training see: http://www.planning-controls.com.au/

PMI-ACP

The PMI ACP exam will also undergo a major revision early in 2018. We are currently assessing the viability of developing a mentored email course for this year exam.

Summary

From the information currently available to PMI R.E.P.S the new version of the PMBOK® Guide has a lot to offer the industry. From a trainer’s perspective there is a lot of work to do over the next six months but at the end of that time, we will have significantly improved training material based on a much stronger foundation. Interesting times ahead!

_______________________

 

[1] for a more detailed discussion on the early days of the PMBOK® Guide see: /2014/10/31/the-pmp-examination-is-30-years-old/

[2] For more on the PMBOK® Guide 6th Edition enhancements see: /2016/06/28/pmbok-guide-6-edition-takes-a-major-step-forward/

USA moving to formalise project and program management capabilities

The concept of professional project management is gathering pace. The USA Government’s Program Management Improvement and Accountability Act of 2015 (PMIAA) was unanimously passed by the US Senate by in November 2015, and was passed by Congress in September 2016 on a 404-11 vote.  Because Congress made some minor changes, it now has to was returned to the Senate before it can be and signed into law by the President on the 14th December 2016 (see comment below).

The Act requires the Deputy Director for Management of the Office of Management and Budget (OMB) to:

  • adopt and oversee implementation of government-wide standards, policies, and guidelines for program and project management for executive agencies;
  • chair the Program Management Policy Council (established by this Act);
  • establish standards and policies for executive agencies consistent with widely accepted standards for program and project management planning and delivery;
  • engage with the private sector to identify best practices in program and project management that would improve Federal program and project management;
  • conduct portfolio reviews to address programs identified as high risk by the Government Accountability Office (GAO);
  • conduct portfolio reviews of agency programs at least annually to assess the quality and effectiveness of program management; and
  • establish a five-year strategic plan for program and project management.

The Act also requires the head of each federal agency that is required to have a Chief Financial Officer (other than Defence which has its own rules) to designate a Program Management Improvement Officer to implement agency program management policies and develop a strategy for enhancing the role of program managers within the agency.

The Office of Personnel Management must issue regulations that:

  1. identify key skills and competencies needed for an agency program and project manager,
  2. establish a new job series or update and improve an existing job series for program and project management within an agency, and
  3. establish a new career path for program and project managers.

And finally, the GAO must issue a report within three years of enactment, in conjunction with its high-risk list, examining the effectiveness of the following (as required or established under this Act) on improving Federal program and project management:

  • the standards, policies, and guidelines for program and project management;
  • the strategic plan;
  • Program Management Improvement Officers; and
  • the Program Management Policy Council.

When enacted the Act will enhance accountability and best practices in project and program management throughout the federal government by:

  1. Creating a formal job series and career path for program/project managers in the federal government, to include training and mentoring – PMP, PMI-SP and similar certifications will become increasingly important!
  2. Developing and implementing, with input from private industry, a standards-based program/project management policy across the federal government.
  3. Recognizing the essential role of executive sponsorship and engagement by designating a senior executive in federal agencies to be responsible for program/project management policy and strategy.
  4. Sharing knowledge of successful approaches to program/project management through an inter-agency council on program and project management.
  5. Implementing program/project portfolio reviews.
  6. Establishing a 5-year strategic plan for program/project management.

You can read the text of the Act here, and stay up-to-date on the Act’s progress here.  The approach USA is aligned with regulatory actions in both the UK and the EU to require government agencies to improve project and program delivery. If this trend continues hopefully the ‘accidental’ project manager / sponsor will be consigned to history and the use of qualified professionals will become the norm.

Follow these links for more on achieving your PMP credential of PMI-SP credential.

New Planning and controls website

Our new project Planning and Controls website at www.planning-controls.com.au/ is now up and running.  This site currently has two focuses:

Helping people study to pass their PMI-SP® examination:  www.planning-controls.com.au/pmisp-courses/  Backed by a library of helpful PMI-SP exam support resources:  www.planning-controls.com.au/support/

Providing a single location for planners and schedulers to access our library of project controls papers and other free resourceswww.planning-controls.com.au/controls/   Almost all of the papers are available for download and use under the Creative Commons licence.

This site will be progressively updated with a view to becoming a key reference for all planning and control professionals worldwide!  Any suggestions for improvements will be appreciated – we look forward to hearing from you.

 

 

PMP & CAPM Exam Site Upgrade

Our PMP and CAPM examination training and information website has undergone a major upgrade. All of the information you need to understand the PMI requirements, apply for the examination and access to our world-class courses is now in the one easy-to-use website.

In addition to our course information there are pages to help you:

All of the information on the site is freely available to anyone interested in either the PMP or CAPM examination – feel free to browse at any time: http://www.mosaicproject.com.au/

PMP® exam is changing on 11th Jan. 2016

This post offers a detailed look at the new PMP examination content and what you can expect to see different in a exam taken after the 2nd November 2015.

Notes:

  1. PMI have moved the start date back from the originally publicised date in November to January 2016.
  2. There will be no changes to the CAPM exam or any other PMI credential other than the PMI-ACP.
  3. Our free daily PMP questions are now aligned to the new exam see: http://www.mosaicprojects.com.au/Training-PMP-Q-Today.html
  4. All PMP of our courses starting from September 1st will be aligned to the new PMP examination, see:  http://www.mosaicproject.com.au/

The starting point for this update is the PMP Role Delineation Study (RDS) completed in April 2015, which has provided an updated description of the role of a project management professional and will serve as the foundation for the updated PMP exam. To ensure its validity and relevance, the RDS update has captured input from project management practitioners from all industries work settings, and regions. The research undertaken to update the RDS included focus groups, expert input and a large-scale, global, survey of Project Management Professional (PMP)® certification holders.

Overview of Changes

The RDS defines the domains and tasks a project manager will perform plus the skills and knowledge that a competent project manager will have. The five ‘domains’ of  Initiating, Planning Executing, Mentoring & Controlling and Closing remain unchanged, although there has been a slight reduction in the importance of ‘closing’ and an increased emphasis on executing (reflected in the allocation of questions). The other major changes are:

  • An emphasis on business strategy and benefits realisation: this new, included because many PMs are being pulled into a project much earlier in its life when business benefits are identified. There is also an increased focus across all of the other domains on delivering benefits (not just creating deliverables).
    See more on benefits management.
  • The value of lessons learned now has added emphasis: lessons should be documents across the whole project lifecycle and the knowledge gained transferred to the ‘organisation’ and the project team. See more on Lessons Learned.
  • Responsibility for the project charter shifted to the Sponsor: Most project managers are not responsible for creating the charter; the Sponsor or project owner is primarily responsible.  The PM is a contributor to the development and is responsible for communicating information about the project charter to the team and other stakeholders once the project starts.
    See more on the Project Charter.
  • Added emphasis on enhancing project stakeholder relationships and engagement: The RDS sees stakeholder engagement as a two way relationship rather than a one-way reporting function. Communication is expanded include an emphasis on relating and engaging with stakeholders. This is the theme of our last post, see: The Elements of Stakeholder Engagement.

Major Content Changes

A summary of the major content changes is:

Domain 1 Initiating the Project

Percentage of questions unchanged 13% =  26 questions.

Three tasks added:
–  Task 2: Identify key deliverables based on business requirements.
–  Task 7: Conduct benefits analysis.
–  Task 8: Inform stakeholders of approved project charter.

One task deleted:
–  Old Task 2: Define high level scope of the project.

One task significantly changed:
– Task 5: changed from ‘develop project charter’ to ‘participate in the development of the project charter’.

Major changes in the knowledge and skills required for this domain.

Domain 2 Planning the Project

Percentage of questions unchanged 24% =  48 questions.

One task added:
–  Task 13: Develop the stakeholder management plan.

One task significantly changed:
–  Task 2: expanded from ‘create WBS’ to ‘develop a scope management plan (including a WBS if needed)’.

The knowledge and skills required for this domain have been revised but basically cover the same capabilities.

Domain 3 Executing the Project

Percentage of questions increased from 30% to 31% =  62 questions.

Two tasks added:
–  Task 6: Manage the flow of information to stakeholders.
–  Task 7: Maintain stakeholder relationships.

One task deleted:
–  Old Task 6: Maximise team performance.

The knowledge and skills required for this domain have been revised but basically cover the same capabilities with the exception of the addition of ‘Vendor management techniques’.

Domain 4 Monitoring and controlling the project

Percentage of questions unchanged 25% =  50 questions.

Two tasks added:
–  Task 6: Capture, analyse and manage lessons learned.
–  Task 7: Monitor procurement activities.

One task deleted:
–  Old Task 6: Communicate project status to stakeholders.

The knowledge and skills required for this domain have been revised and expanded.

Domain 5 Closing the project

Percentage of questions reduced from 8% to 7% =  14 questions

No new tasks added or significantly changed.

The knowledge and skills required for this domain have been revised but basically cover the same capabilities.

Cross Cutting Knowledge and Skills

Cross cutting knowledge and skills are capabilities required by a project manager in all of the domains.  This areas of the RDS has been increased significantly.  The full list of knowledge and skills is
(* = included in previous RDS):
1.   Active Listening*
2.   Applicable laws and regulations
3.   Benefits realization
4.   Brainstorming techniques*
5.   Business acumen
6.   Change management techniques
7.   Coaching, mentoring, training, and motivational techniques
8.   Communication channels, tools, techniques, and methods*
9.   Configuration management
10. Conflict resolution*
11. Customer satisfaction metrics
12. Data gathering techniques*
13. Decision making*
14. Delegation techniques
15. Diversity and cultural sensitivity*
16. Emotional intelligence
17. Expert judgment technique
18. Facilitation*
19. Generational sensitivity and diversity
20. Information management tools, techniques, and methods*
21. Interpersonal skills
22. Knowledge management
23. Leadership tools, techniques, and skills*
24. Lessons learned management techniques
25. Meeting management techniques
26. Negotiating and influencing techniques and skills*
27. Organizational and operational awareness
28. Peer-review processes
29. Presentation tools and techniques*
30. Prioritization/time management*
31. Problem-solving tools and techniques*
32. Project finance principles
33. Quality assurance and control techniques
34. Relationship management*
35. Risk assessment techniques
36. Situational awareness
37. Stakeholder management techniques*
38. Team-building techniques*
39. Virtual/remote team management

Two skills that have been dropped are knowledge of:
–  PMI’s Code of Ethics and Professional Conduct
(although this continues to have a major influence on the approach PMI
     expects project managers to adopt in the exam and the ‘real world’).
–  Project Management Software

The effect on the exam

PMI have advised that 25% of exam content will be new, focused on new topic areas (ie, the eight new tasks) added to examination, in addition, many other questions will be updated to reflect changes in the descriptions of tasks and changes in the underpinning skills and knowledge requirements.  We will be updating our materials from September 2015 to take these changes into account. Fortunately a large percentage of the ‘new’ materials from the RDS are already part of our PMP course (because we felt they were essentially good practice) or in other training courses we offer – overall this update makes very good sense.

Many aspects of the PMP exam are not changing including the eligibility requirements, formal training requirements, the passing score (which remains secret) and the design of the questions, many of which are scenario based seeking information on what should you do.

There is no change to other PMI exams, the CAPM, PMI-SP and other credentials remain unaltered.

Will there be more changes?

The sort answer if ‘yes’! Changes in the RDS occur every 3 to 5 years and as a consequence, the exam content outline changes, new topics are added, and shift in weighting occur.

In addition, the PMP exam also changes when the PMBOK® Guide is update (this is due in 2017). Changes in the PMBOK® Guide cause changes in terminology, changes to elements of process groups and exam questions are changed to reflect these alterations. However, many other references are used to create PMP content in addition to the PMBOK,  and if the PMBOK has contents not reflected in the RDS this section not examined.

So moving forward, the current version of the exam is active until 1st Nov. 2015; the new version of the exam is available from 2nd Nov. 2015, and the next change will be in mid-to-late 2017.

For this change, there is no change over period (including for re-sits) – the ‘old’ exam applies up until the 1st, the new exam from the 2nd November.  Both before and after the change, your exam results available immediately if you take a computer based test.  For more on the current examination, fees, eligibility requirement, etc, see: http://www.mosaicproject.com.au/pmp-training-melbourne/.

A different set of changes has been announced for the PMI-ACP (Agile) credential (visit the PMI website for more details).

PMI have also announced changes to the way PDUs are earned as part of their Continuing Certification Requirement (CCR) program, effective from the 1st December 2015.  For more on this change see: /2015/06/06/pmi-pdu-update/

PMP for Christmas??

There are two opportunities to make the holidays a springboard for you career in 2015.

You last chance for a PMP or CAPM before Christmas is our 5 day intensive courses starting on the 1st December – these are timed to allow you to sit the exam in the week prior to Christmas.

Alternatively make good use of the ‘silly season’ and book into the courses starting on the 19th January.  Complete your training, enjoy the Australia day long weekend and be ready for work once Australia ‘wakes up’ after the summer break.

CAPM course details see: http://www.mosaicproject.com.au/capm-courses-melbourne/

PMP course details see:  http://www.mosaicproject.com.au/pmp-courses-melbourne/

The PMP® Examination is 30 years old

The PMP® credential is probably the oldest and most widely recognised project management credential in the world.

PMI® was not the first project management association, that honour goes to the European INTERNET (now IPMA), but it did lead the way in developing a project management examination and a supporting body of knowledge.

PMI was founded in October 1969 at the Georgia Institute of Technology as a non-profit organisation focused on the field of project management. By the time of the 1976 PMI Montreal Seminars/Symposium, the idea that ‘project management’ practices could be documented was being widely discussed along with the concept of project management as a profession.

These discussions continued through to 1981 when the PMI Board of Directors formally approved a project under the leadership of  Matthew Parry to:

  1. Define the distinguishing characteristics of a practicing profession (ethics)
  2. The content and structure of the profession’s body of knowledge (standards)
  3. Recognition of professional attainment (accreditation)

The project team became known as the Ethics Standards and Accreditation (ESA) Management Group.

The results of the ESA project were published as a Special Report in the Project Management Journal, August 1983. The Special Report included:

  1. A code of Ethics and a procedure for enforcement
  2. A standard knowledge baseline consisting of six major ‘functions’, Scope, Cost, Time, Quality, HR and Communication.  The term ‘functions’ was used, because most were named after the typical ‘functions’ (departments) of a large engineering company (now called knowledge areas).
  3. Recommendations for both the accreditation of courses provided by institutions (Universities) and individual certification.

This report subsequently served as the basis for PMI’s initial Accreditation and Certification programs. The  first PMPs credentials awarded in 1984 and Western Carolinas University, Masters in Project Management degree was the first course accredited by PMI.

The initial version of the PMP exam was 40 questions in each of the 6 knowledge areas with at least 70% correct in each to pass.  This version of the multi-choice exam presented 5 options and included a fair number of combination choices (e.g., “a and b”).

On the 25 March 1986, I joined PMI as member # 13,428 to tap into the knowledge PMI were developing through their Journals and standards to help with my work as a project management consultant. 28 years later I’m still an active PMI member.

In 1986/87 the PMI Board approved a second standards related project, to review and enhance the 1984 documents. In addition to expanding and enhancing the six original ‘functions’, the Risk and Contract/Procurement ‘functions’ were added along with a section on the ‘Project Management Framework’ which placed project management within the context of the wider environment and general management. This work was published as the ‘Project Management Body of Knowledge (PMBOK)’ in 1987.

The updated PMP exam was now 40 questions each for the 8 ‘functions’ with at least 70% correct in each to pass. It was 320 multiple choice questions that took 3 hours and 20 minutes in the morning for the first 160 questions and another 3 hours and 20 minutes in the afternoon for the second group of 160. Also around this time, PMI eliminated the “a and b” options and changed the exam from 5 options to 4.

Between 1991 and 1996, a major review of the PMBOK was initiated under the leadership of Bill Duncan resulting in the publication of ‘A Guide to the Project Management Body of Knowledge’, the first edition of the PMBOK® Guide.  The important ‘Integration Knowledge area was added and the document extensively reorganised. The now familiar ‘processes were added to standardise the flow of information within a project (with inputs, tools and techniques and outputs described – most outputs becoming inputs to subsequent processes).

The PMP exam was changed again in the latter half of the 1990s.  It went from a written test to computer based test, from 320 questions to 200 questions and the passing score went from 70% in each knowledge area to 61% overall.  With the new format and ease of access to examination centres via the Thompson Prometric world-wide delivery system the PMP exam took off.

We passed our PMP examinations in 2001 and started developing our PMI courses, initially focussing on the new CAPM Credential, then the PMP credential – we are still developing and adapting our courses to stay aligned with changes in focus of the examination!

The 2000 and 2004 updates to the PMBOK® Guide set the pattern of regular 4 yearly updates. The 2004 (Third Edition) was the first time I contributed to the development process which has continued trough the 2008 and 2012 updates. The 2012 update included the new knowledge area of Stakeholder Management.

The regular updates required of an ANSI standard continue, with work on the 6th Edition currently in progress for publication in 2016, with Lynda Bourne leading work on the Stakeholder and Communication chapters.

Each update of the PMBOK® Guide flows through to updated PMP and CAPM examinations as do the less regular reviews of the PMP and the CAPM role delineation studies and examination specifications. So whilst the PMP examination is 30 years old, and the CAPM examination is 11 years old, both certifications remain a rigorous test of current project management knowledge.

The last set of significant changes to the exam delivery has been to change the passing assessment to remove the set pass/fail score and assess each test based on the use of psychometric analysis (see more)

Over the last 30 years, the PMBOK® Guide has largely shaped the world-wide view of what project management is; I know from my time working on the development of ISO 21500:2012 – Guidance on project management was heavily influenced by the PMI PMBOK. There are certainly other excellent BoKs produced in the UK, Japan and Germany to my certain knowledge; and the PRINCE2 certification is challenging the PMP credential for dominance; but everyone’s view of ‘project management’ is largely consistent and framed by the PMBOK® Guide.

So if you are a PMP holder or are planning on taking the PMP examination, I’m hoping this brief rundown on the history of the credential and its associated ‘body of knowledge’ provide some background on why the PMBOK® Guide and the examination are  the way they are. It’s been a long journey which continues.

For more on the history of Project Management see: http://www.mosaicprojects.com.au/PM-History.html

For more on the PMP and CAPM examinations see: http://www.mosaicproject.com.au/

New PMP and CAPM Courses

To meet the demand for PMP and CAPM training in the lead up to Christmas, we are please to announce new PMP and CAPM Intensive courses have been scheduled for the 1st to the 5th December.

Booking and course details are available on-line:

PMP:    http://www.mosaicproject.com.au/pmp-courses-melbourne/

CAPM: http://www.mosaicproject.com.au/capm-courses-melbourne/

This course is your last chance to complete a PMP or CAPM course this year!! Our 2015 program is also open for bookings at the same URL.

The Psychology of Effective Learning

We are always looking at the best options for our course design to help people learn the masses of material needed for the PMP, CAPM and PMI-SP examinations in particular.  A report published on the 9th January by the Association for Psychological Science, written by Professors John Dunlosky, Katherine Rawson, Elizabeth Marsh, Mitchell J. Nathan and  Daniel Willingham, suggest most of what we do in our PMI courses aids effective learning (read the report).

Teaching and learning are interrelated – a successful examination outcome requires good materials, good teaching techniques and effective learning on the part of the exam candidate;  but people lean in a variety of ways and have different learning preferences. This post and the referenced reports highlight the most effective learning options.

Learning styles

The term learning styles refers to the concept that individuals differ in regard to what mode of instruction or study is most effective for them. Whilst there are many different models of ‘learning styles’, they all basically include variations on these three modes:

  • Visual learners have a preference for images, they ‘think in pictures’ and like visual aids that represent ideas such as graphs, charts, diagrams, symbols, etc.;
  • Auditory learners learn best through listening to lectures, discussions, tapes, etc.;
  • Kinesthetic or tactile learners prefer to learn via experience – moving, touching, and doing things to ‘build experience’.

These styles are overlaid with a person’s preference for learning is a social or solitary environment and how they absorb and process the information through reflection or other options to create a complex web of possibilities:

There is plenty of evidence that, if asked, people will express preferences about how they prefer information to be presented to them. There is also plentiful evidence arguing that people differ in the degree to which they have some fairly specific aptitudes for different kinds of thinking and for processing different types of information. Derived from this starting point, the most common hypothesis about the instructional relevance of learning styles is the meshing hypothesis, according to which instruction is best provided in a format that matches the preferences of the learner

However, there is very little evidence to suggest this ‘meshing hypothesis’ is valid. Whilst we try to include elements of all three styles in our courses, a person’s preferred ‘learning style’ is not a measure of effective instructional design: see: Learning Styles Concepts and Evidence http://psi.sagepub.com/content/9/3/105.short.

Learning techniques

Techniques are partly instructional design and partly student behaviour. However, unlike ‘learning styles’, there is a significant body of literature evaluating the effectiveness of learning techniques. From this large resource, the Dunlosky report examines ten of the most popular learning techniques to assess whether the technique’s benefits generalise across four dimensions:

  • learning conditions (e.g., studying alone vs. studying in a group),
  • student qualities (e.g., age or ability),
  • materials (e.g., scientific concepts, historical facts, mathematical problems), and
  • the criterion tasks on which learning is measured (e.g., essay tests that require transfer of learning, multiple-choice tests).

The report’s conclusions rate each technique from high to low utility on the basis of the evidence the author’s amassed:

The least effective techniques

Highlighting, underlining, rereading and summarizing were all rated by the authors as being of ‘low utility’:

  • Highlighting and underlining led the authors’ list of ineffective learning strategies. Although they are common practices, studies show they offer no benefit beyond simply reading the text. Some research even indicates that highlighting can get in the way of learning because it draws attention to individual facts, which may hamper the process of making connections and drawing inferences.
  • The practice of rereading is common (and to a degree essential) but it is much less effective than some of the better techniques you can use.
  • Summarising, or writing down the main points contained in a text, can be helpful for those who are skilled in the practice, but again, there are far better ways to spend your study time.

More effective techniques

Techniques in the middle ground are better, but not especially effective and were rated of “moderate” to “low” utility by Dunlosky et al because either there isn’t enough evidence to be able to recommend them or in other cases, the strategy has been shown to work in some situations but not in others. These include:

  • Mental imagery, or coming up with pictures that help you remember text. This practice is time-consuming and only works with text that lends itself to images (eg, for McGregor’s Theory X, Theory Y imagine a lazy person laying on the X axis of a chart);
  • Mnemonic, using words, phrases or images to link more complex ideas. A mnemonic aims to translate information into a form that the brain can retain better than its original form; for example:
    –  Learning the French word for key, la clef, by imagining a key on top of a cliff;
    –  Using the letters of a word to spell out the first letters of a process; SMART = Specific, Measurable, Achievable, Relevant, Time-framed (applied to objectives or delegations).
    –  Using a phrase to remember a sequence. For example, to memorise the colours of the rainbow, use the phrase Richard Of York Gave Battle In Vain – each of the initial letters matches the colours of the rainbow in order: Red, Orange, Yellow, Green, Blue, Indigo, Violet.
  • Self-explanation and elaborative interrogation were shown to be reasonably effective in experimental studies. Elaborative interrogation involves students ask themselves why the information they are reading is true; and self-explanation is where students explain some procedure or process to themselves. But, the effectiveness of the techniques depends on how complete and accurate your explanations are;

The Best
Learning strategies with the most evidence to support them, rated as having “high utility” by the authors, include distributed practice, and practice tests.

  • Distributed practice and interleaved practice. This tactic involves spreading out your study sessions. Learning can occur quickly under massed-practice conditions and is an efficient way to teach, but hundreds of studies have shown that distributed practice leads to more durable learning. Certainly cramming information at the last minute may allow you to get through a test, but the material will quickly disappear from memory. It’s much more effective to dip into the material at intervals over time and mix up different types of problems and learning. This is core to our course design – topics are taught in blocks (unavoidable for intensive courses) but each test and revision element always covers a range of subjects covered to ‘this point’. Interleaved practice (in which bouts of study for one topic are interleaved among study for other topics), seems promising in some situations, but lacked the general utility of distributed practice and retrieval practice via testing.
  • Testing – but not for a grade. Research shows that the act of recalling information strengthens that knowledge and aids in future retrieval. Again, practice testing is central to our course design and there is robust evidence supporting its value!
  • Flash cards are a good option for implementing distributed learning and testing. We offer a free ‘daily flash’ via Twitter, see: https://twitter.com/PMPQuestions; and our PM final on-line simulator can be used in a similar way and possibly the best option – make your own. We are exploring the concept of ‘electronic flash cards’ – watch this space.

So in summary, the authors recommend you spread out your learning, ditch your highlighter and get busy with your tests and flash cards.  And you do need to practice!

We all know we have to practice a skill to get better at it, but the improvement we’re aware of making is only part of what’s going on. Well past the point when we think we’ve ‘got it’, continued practice allows our brain and our muscles to become more accurate and efficient in carrying out the task, using less energy to do so. As decathlete Daley Thompson said “An amateur practices until they get it right, a professional practices until they cannot get it wrong!”  And lastly, the easiest way of all to improve implicit learning is sleep. Research has shown that during sleep, the brain identifies meaningful patterns in our memories from the preceding day and makes them stronger and more permanent.

A final thoughts: studies from 1901 onwards have shown that learning is context specific. Practicing memorizing one type of material (eg, lists of words) may improve performance on memorizing similar lists (the phenomenon of learning to learn), but the benefits of such practice will not generalise to learning other materials. If you want to study for a multi-choice project management exam, your training and study needs to be focused on that challenge. For more thoughts and ideas on learning see: http://www.mosaicprojects.com.au/WhitePapers/WP1028_The_Art_of_Learning.pdf

Scope for improvement 4

A couple of interesting things happened on the 1st July,  the first was being invited to a wonderfully old-fashioned business lunch by Ashurst Lawyers with Champaign and fine wines – a far too frequent event in these days of OH&S liabilities……  The second was attending the preview of the Bell Shakespeare’s interpretation of Henry V.  You may wonder what the connection is.

Henry V has a number of memorable speeches focused around battling insurmountable odds to overcome adversity…… ‘Once more dear friends unto the breach let us block the gap with [engineering] dead’‘We few, we happy few, we band of brothers. For he to-day that sheds his blood with me shall be my brother …..’.  Stirring stuff given the character assassination most of the Plantagenet Kings suffer at the hands of the Bard. Which brings me back to the lunch.

Ashurst were launching the fourth report in the ‘Scope for Improvement’ series looking at the management and delivery of mega projects in Australia.  And unfortunately it really was a case of ‘once more dear friends……’  The title of the original 2006 report was derived from its major finding that scope was routinely omitted from tender documentation for mega projects.  The second report 2008 identified the consequences from scoping inadequacies. Survey participants attributed cost overruns (61%), delayed completion (58%) and disputes (30%) to scoping inadequacies. Further, scoping inadequacies had resulted in 26% of the $1 billion+ projects surveyed being more than $200 million over budget.  In 2006 and 2008 there was definitely ‘scope for improvement’; in 2014 the situation remains fundamentally unaltered.

The research for the 2014 report used a qualitative approach starting with discussions over lunch with some 130 executives (primarily from the organisations involved in the Australian Contractors Association), the discussions were documented and the emerging hypotheses tested in focused one-on-one interviews. This methodology has undoubtedly generated some interesting and important insights to the challenges faced by the major projects industry; but unfortunately the methodology prevents a precise trend analysis on this major area of concern. All we know for sure is it remains a major area of concern.

Probably the most telling insight in explaining the reason for the continuing omission of scope is the imposition of unreasonable time pressures to complete the work.  This pressure comes in part from the lack of any overall strategy on the part of the clients that defines the need for the project, meaning there is no ‘master plan’ to provide a framework for developing the project’s scope in a sensible timeframe.  This is a fundamental governance failure – very few mega-projects need to undertaken in ‘panic mode’.

The second insight is the effect of perceived ‘political imperatives’ that push governments and/or organisational executives to simply demand the work be accomplished in an unreasonably short timeframe. For some reason a completely unnecessary need for speed seems to have come to dominate executive decision making.  This demand for excessive speed will always drive up cost, increase risk and reduce quality.  This is equally true of a small $50,000 IT project as it is of a $multi-billion infrastructure project such as the National Broadband Network.

The only option to achieve excessive speed without compromising quality too much is to employ highly skilled people with direct experience of the work.  But as another section of the ‘Scope for Improvement’ report highlights, skills are in very short supply and only half the people in any group can be ‘above average’ – you simply cannot achieve ‘above average performance’ all of the time.

Certainly there will always be a limited number of projects where speed is an imperative, for most a combination of better strategic planning so the work is started at the right time and/or simply allowing adequate time will produce far better quality outcomes at a significantly reduces cost. Getting this balance right, and requiring management to have the right systems in place to avoid unnecessary ‘time pressures’ is a key governance imperative.

Simply having an immovable deadline is not an excuse. The London Olympics infrastructure was started ‘early’, properly resourced from the beginning, used appropriate procurement systems and finished a year ahead of the opening ceremony with no fatalities. Contrast the success of this project to similar ones in New Delhi and Rio de Janeiro where strategic decisions were not made at the right times, pressures to ‘increase speed’ developed and cost, quality and safety all suffered (or in the case of Brazil, are suffering).

The current ‘Scope for Improvement’ report identifies a range of solutions to this problem:

  • Clearly identify the project objectives.
  • Education on the importance of scoping.
  • Allow sufficient time allowed to prepare the scope
  • Employ sufficient personnel of the right quality to prepare the scope. Including providing adequate training for the personnel involved in preparing the scope.
  • Choose the right delivery model and the right method of describing the scope (performance based where appropriate).
  • Get the right people involved, with a collaborative process to obtain input from key stakeholders (including the end users).

Another area of the report that will be discussed in a later post is the interlinked topics of productivity, innovation and training. In the meantime, the Scope for Improvement reports can be downloaded from: http://www.ashurst.com/publication-item.aspx?id_Content=10561&langId=1