Cobb’s Paradox is alive and well

In 1995, Martin Cobb worked for the Secretariat of the Treasury Board of Canada. He attended The Standish Group’s CHAOS University, where the year’s 10 most complex information technology (IT) projects are analysed. The high level of failure led Cobb to state his now famous paradox: “We know why projects fail; we know how to prevent their failure—so why do they still fail?”

In 2011, another report into the management of IT projects asks the same question! This time the report was prepared by the Victorian Government Ombudsman, in consultation with the Victorian Auditor-General, it documents another series of failures largely created by executive management decisions. The report entitled Own Motion Investigation into ICT – Enabled Projects, examines 10 major Victorian Government ICT projects that experienced difficulties such as budget and timeframe blowouts or failure to meet requirements.

Portfolio Management
Problems identified by the Ombudsman in the area of Portfolio management and governance include a lack of effective leadership, accountability and governance. He was particularly concerned about poor project governance, the lack of accountability of project stakeholders and a lack of leadership — a reluctance to take tough decisions.

These failures contributed to poor decision making, and an inability or reluctance to make difficult, but necessary decisions. Leaders lead and determine governance practices; the resources needed to implement these facets of effective Portfolio management are readily available including:

Project Definition
It is impossible to deliver a project successfully if the decision to proceed is based on inaccurate assessments in the business case. The Ombudsman commented on the inadequacy of business cases, the failure to fully define requirements for new systems, a general reluctance to change business processes to better fit with off the shelf products (to reduce cost and risk) and a ‘tick the box’ approach to risk management (ie, avoiding any real assessment of risks and opportunities).

Linked to this lack of definition major project funding decisions were announced publicly before the business case was fully developed (representing either wishful thinking or a wild guess?), and high risk decisions being made to only partially fund some projects.

The solution to these issues is a robust and independent PMO that has the skills and knowledge needed to validate business cased before they go forward to management for decisions. Many years ago, KPMG released a series of reports that highlighted the fact that organisations that failed to invest in effective PMOs were simply burning money! The Ombudsman’s report shows that ‘burning public money’ is still a popular pass time.

For more on PMOs and to download the KPMG reports see: http://www.mosaicprojects.com.au/Resources_Papers.html#Proj_Off

Risk Management
Many of the factors identified above and in my view the primary cause of most bad decisions is the abject failure of senior management to insist on a rigorous risk management process. Risk management is not about ‘ticking boxes’, it is about having the ethical courage to objectively explore the risks and then take appropriate actions to either mitigate the risk or provide adequate contingencies within the project budget. This failure was manifest by an inconsistent approach to contingency funding. There are many examples of high risk decisions being made without any contingency provisions:

  • The Myki ticketing system was let to an organisation that had never delivered a ticketing system before. No contingencies were made for this high risk decision and the project is years late, $millions over budget and will only deliver a small part of the original scope.
     
  • Agencies preferred to be on the leading edge rather than leveraging what had been done by others elsewhere. This may be justified but not without proper risk assessment, mitigation and contingency.

Government agencies are not alone in failing to effectively manage risk in ICT procurements. The same problem has been identified in major infrastructure projects, in a series of reports by Blake Dawson; see: Scope for improvement

There are always difficulties in transferring project risks to vendors, and dealing with large vendors who may be more experienced in contract negotiation than their agency counterparts. Whilst modern forms of contract provide opportunities to adopt innovative procurement processes that could significantly reduce project risks for vendors and customers these were not used.

As our paper, The Meaning of Risk in an Uncertain World  and the Blake Dawson reports clearly demonstrate, not only is it impossible to transfer all of the project risk to a vendor, it is totally counterproductive to try! Organisations that try to transfer ‘all of the risk’ end up with a much poorer outcome than those organisations that actively manager the risks in conjunction with their vendors.

Large ICT projects are inherently complex and necessarily involve some significant risks. But these can be mitigated to some degree by taking heed of the Ombudsman’s observations, lessons learnt in other projects and the implementation of robust and independent systems.

The PMI Practice Standard for Risk Management provides  good starting point.

Recommendations
The Ombudsman’s recommendations on how to address these issues can be applied to ICT and other projects undertaken by other state, local and Commonwealth government agencies, and in the private sector: Download the report.

In my opinion, the primary cause of these failings, referenced but not highlighted by the Ombudsman, is cultural. Executives and senior managers overtly preferring the status quo and the current power structures they have succeeded within over leading the implementation of change that will deliver improved outcomes for their organisations but make people more accountable and redistribute organisational power. This was the focus of my last posting; Culture eats strategy for breakfast 2!

As Martin Cobb observed in 1995, “We know why projects fail, we know how to prevent their failure — so why do they still fail?” Unfortunately this is still a valid question more that 15 years later and, without leadership from the very top, I expect the effect of this report will be little different to the dozens of similar reports generated over the years and we will still be asking the same question in 2020.

The answer is culture and leadership – to change the culture within senior management ranks, the owners of organisations need to take actions similar to the Australian Federal Government and mandate effective processes and then measure performance in their implementation and use. The implementation of the Gershon Report that is being forced through the federal government departments is a Cabinet level initiative. It is still too soon to judge wether the initiative will be successful, effective culture change takes years to embed in major organisations, but at least the push has started at the right level. My feeling is that if the pressure is maintained for another 3 or 4 years (the original report was released in 2008) there may be some real benefits. To avoid similar reports to this one in the future, the leaders of other organisations need to take similar robust, strategic action tailored to the needs of their organisation.

Project professionals can help by effectively communicating to your top-level executives the real benefits of effective project governance. For many ICT and other technical/engineering professionals this represents is a whole new set of skills to learn, my book Advising Upwards may help!

Projectchat 2011

I’ve been at the Projectchat 2011 conference in Sydney for the last couple of days. Projectchat is the ‘home’ of the Deltek community with a strong focus on scheduling and Earned Value.

The event this year has been organised by a new name, Connexion Systems Pty Ltd. New name, same team – Connexion has evolved from WST Pacific through Deltek Australia to its present form and remains the primary sales and support agency for Open Plan, Cobra, and associated tools in Australia.

My personal high point was the standing room only audience for the first airing of my thoughts and ideas on refocusing scheduling tools to focus on optimising the critical work and the critical workers rather than arbitrary activities, durations and ‘float’. The presentation can be downloaded from: http://www.mosaicprojects.com.au/Resources_Papers_152.html

Other thoughts and feelings include how little organisations have learned over the last 25 years, highlighted by Greg Betros’ paper, the same bad practices remain far too common. Countered by an expanding recognition that scheduling and project controls matter and the expanding interest in training and certification (for more on this topic see: http://www.mosaicprojects.com.au/Resources_Papers_149.html).

Another highlight was the overview of PMI’s updated Practice Standard for Earned Value Management presented by one of the core team members Lloyd Carter. The 2nd Edition has significant improvements over the original and aligns with AS 4127. I’ve bought a copy and will post on this shortly.

As always with Projectchat, there was a great party last night… now all I need to do is get through the rest of the sessions.

Culture eats strategy for breakfast 2!

In my first post on this topic I suggested that:

  • Even where a smart business has aligned the project with a sensible/necessary strategic intent, and then properly leads and resources the effort, failure is still likely if the power of culture is ignored.
     
  • And culture can be loosely defined as ‘the way we do business here’ and incorporates attitudes, expectations and the way both internal and external relationships work. The people in the organisation are there because they can operate in the culture as it currently is and embody the culture; they are predisposed to resist change.

This post looks at the entrenched nature of culture and its affect on change.

Surveys by the Australian Institute of Management and others consistently show that around 30% of people in an organisation are looking to leave; which means 70% are content. This majority are comfortable within the current status quo and know how to ‘work the system’ to their advantage. The 30% who aren’t happy may be open to change but are also already disaffected and therefore probably disinterested.

Introducing a new ‘best practice’ will inevitably change the status quo and change the relative power balances within the organisation. A couple of examples:

  • The organisation decides to introduce an effective scheduling system (possibly supported through a PMO). The people involved in doing the schedule gain ‘power’ they develop the schedule and report progress against the plan. The project teams lose power, they need to conform to the plan (losing the flexibility to do what they feel like on a day-to-day basis) and failures to achieve the schedule are highlighted to management much sooner than if the schedule was not being used. We can prove having an effective schedule improves the probability of project success (see: Proof of the blindingly obvious), but what’s good for the organisation as a whole is not necessarily going to be seen as good by the individuals affected by the ‘improvement’.
     
  • The organisation decides to introduce a Portfolio Management process to select the best projects to undertake to achieve its strategy, within its capacity to properly support the work. This is a great strategic initiative that maximises the value to the organisation but will mean rejecting more the 60% of the potential projects it could do if it had unlimited resources. This means 60% of the pet projects supported by various members of the executive will be canned! Which means these people will lose power and status firstly to the team making the portfolio decisions and secondly to the executives whose projects were selected. Another group disadvantaged by the selection process (or more accurately the rejections) are the teams who develop the idea and build the business case for the non-selected projects.

In both cases what’s good for the organisation is potentially bad for a large group of individuals who are currently happy and effective working within the current culture and structures of the business – if they weren’t happy they would not be there!

In Culture eats strategy for breakfast! #1, I raised the concept of creating ‘space’ in the existing culture for the change initiative to move into and fill. This ‘space’ is created by crafting a general acceptance within the culture that the current status quo is not working well for the majority and some sacrifice of existing power and ‘comfort’ is generally warranted for the good of each individual as well as the organisation. This objective can be achieved in a number of ways:

  • by identifying a ‘clear and present danger’ that is threatening the group and the organisation as a whole – the need to change to survive;
  • alternatively a competitive challenge to beat an opposing organisation may work or;
  • best but most difficult to achieve a engendering general striving for excellence simply to be part of something great.

Engendering the move towards accepting or desiring the change requires powerful leadership embodying credibility and a clear message that identifies the reason for the change and generates buy-in to the concept of changing and improving before the specifics are even discussed. This leadership has to come from the top! (see more on leadership)

The more established the ‘culture’ is the harder creating the desire for change becomes. Small and medium sized businesses can link the well being of the business to the benefits of the individuals far easier than large businesses. Commercial organisations can link their success to the well being of individuals far easier than stable government organisations with permanent employment as part of the public servant’s culture. The more resistant the culture, the more important effective leadership linked to powerful communication becomes in creating the space for change.

Once the ‘space’ has been created and the desire to improve is generally present, a careful two-way dialogue is needed to define the best options for change and build engagement, to recognise those who will inevitably lose power or be inconvenienced by the change and to help these ‘losers’ re-gain their losses (or perceive a better future despite the losses). Altruism is wonderful but it is unwise to rely on it as the primary mechanism for change.

There will always be resisters to change, the challenge is to shift the majority to a point where they want the improvements (or at least recognise the changes are essential). In addition to leadership, this also requires effective stakeholder management (see more on stakeholder management ). Once this shift is achieved, traditional change management processes cut in to deal with the implementation of the change, supported by project management processes to create the necessary deliverables to implement the change.

However, if the organisation fails to create the ‘space’ in its existing culture for the new processes to work within, the existing culture will definitely eat the intended strategy for breakfast!

Culture eats strategy for breakfast!

Most business changes involve a strategic intent, implemented by a project or program that defines the new processes and procedures needed to achieve the change and then develops and implements the processes.

Smart organisations realise this is not enough and include training to make the organisations staff familiar with the new processes and the really smart organisations link achieving the intended benefits to a key executives KPIs. And the changes still fail!

Two areas of notable failure are IT projects where the focus is on the technology rather than the business and PMO start-ups where the focus in on processes and reporting rather than improved project outcomes.

However, even where a smart business has aligned the project with a sensible/necessary strategic intent, and then properly leads and resources the effort, failure is still likely if the power of culture is ignored. Culture can be loosely defined as ‘the way we do business here’ and incorporates attitudes, expectations and the way both internal and external relationships work. The people in the organisation are there because they can operate in the culture as it currently is and embody the culture; they are predisposed to resist change.

There is an old joke that asks ‘how many consultants do you need to change a light bulb?’ The answer is ‘one, provided the light bulb wants to change!’ This adage applies to changing culture in any organisation – it wont change unless the people in the organisation want it to change, and overall most people in the organisation are quite happy with the culture as it exists (if they were not, they would move on to another job).

The challenge with implementing changes falls into two areas:

  • The first is doing the ‘right project right’ by implementing effective Portfolio, Program and Project management. Whilst it is true that $billions of projects fail due to poor management practices, these failures are a deliberate choice of executive management. We know how to do projects, programs and portfolio management properly, not implementing effective systems is a cultural decision that prefers the status quo and failure over change.
     
  • The second challenge is cultural; the need to move the organisations culture to allow the change to be implemented effectively. This is a much more difficult process that needs leadership and drive. You need to create the willingness to allow the change to happen, before the change can be implemented effectively, before the benefits of the change can be realised. This requires the people in the organisation to buy into the concept of the proposed change long before the benefits can be tangibly appreciated.

Meeting the challenge of ‘culture’ requires effective leadership; the people in the organisation need to be prepared to follow their leader into the new, unproven future. These traditional aspects of leadership are outlined in our White Paper: Leadership.

Another important facet of leadership is ‘Tribal Leadership’, everyone belongs to one or more tribes of associates (defined as people they know well enough to greet socially) and effective leadership at this social group level can also be a powerful influence for change, firstly to build engagement within the group (see diagram below), then to generate support to allow the change to happen.

Whilst project managers can only ever have a small role to pay in the overall leadership of the organisation (this is the province of CEOs and executive managers), they can be effective tribal leaders.

Most tribes are quite small, less then 120 people. In their book, Tribal Leadership, Logan, King and Fischer-Wright describe an organisation as a tribe of tribes and if the project manager’s tribe expands to include key members of the wider organisational community affected by the planned change, their influence can be significant.

Creating the ‘space’ within a culture to allow change, both from the executive leadership perspective and tribal leadership perspective are elements of effective stakeholder management. What most organisations forget is this part of the change effort has to precede the role out of the new processes and procedures.

Creating the space to allow for the possibility of success is not the end of the change effort. For the change to be fully successful you still need to role out strategically effective processes and procedures, provide effective training and transition support, and then maintain visible support for the change over an extended period until the ‘new’ processes and procedures are fully absorbed in to the culture of the organisation and simply become part of the way the organisation does business.

Unfortunately very few organisations start soon enough or continue long enough with the overall change effort to be successful. But without this sustained effort, culture eats strategy for breakfast.

See also Culture eats strategy for breakfast 2!

Planning Planet Guild Update

After two years of development, the basic framework of the Planning Planet ‘International Guild of Project Controls’ (GPC) is in place to develop a career framework and accreditation system for project controls professionals. The mission of the GPC is to develop a centre of excellence for developing the skills, expertise and capability of professionals in the field of project controls.

The Planning Planet, GPC announcement on the 11/11/11 confirms the Guild’s aims, objectives, governance processes, controls and initial management team are all in place.

The professional development teams are working to establish a framework of ‘standards of practice’ to support project controls professionals in their careers. The current status of this vital work is:

These standards have been mapped to a proposed career framework, and levels of membership, that recognises the different streams of expertise within the overall project controls framework.

With Phase 1 now officially launched, project controls professionals world-wide are invited to become part of the process to define our profession. The first four steps of the process are available now, for you to sign up and support this important development.

Additionally, the schedule leading to the launch of Phase 2 in March 2012 is set out below – if you want to influence this process, now is the time to be involved!!

The launch of Phase 2 will mark the start of formal accreditation to the GPC the intended framework for accreditation has to be finalised but is expected to include the following:

Personally I would like to congratulate James, Theo and the GPC committees on a massive effort and wish them every success as they move forward. If you want to be part of this process or simply find out more, download the GPC Launch presentation and sign up to help at: http://www.planningplanet.com/guild

Proof of the blindingly obvious

We all know good scheduling leads to better project outcomes – certainly for me it’s been a article of faith for most of the last 40 years and ‘obvious’ from observation. But ask me, and any other scheduler I know to prove this fact and we would be hard pressed to come up with anything substantive.

Over the years there have been many surveys that link the lack of effective planning to poor project outcomes. One of the more definitive was undertaken by the CIOB in 2008 (download the report Managing the Risk of Delayed Completion in the 21st Century). But showing projects tend to fail if they don’t use effective planning and scheduling is not the same as showing that good planning and scheduling enhances the probability of success.

This has now changed! A paper published by Dr Dan Patterson, the CEO of Acumen, demonstrates a clear link between good schedules (defined as technically competent schedules) and good project outcomes.

Figure 1, taken from Dan’s paper Does Better Scheduling Drive Execution Success? Published in November’s PM World Today shows a strong correlation between the technical competence used to develop the schedule and the number of activities that finished on time. The data is based on a sample of 35 large projects ranging from US$15 million to US$30 billion.

Link the CIOB findings with Dan’s data and the message is blindingly obvious – if you are running a large project without a competent scheduler supporting the management team with effective scheduling, you are virtually guaranteeing failure!

Hopefully the work currently being undertaken by Planning Planet, CIOB and others to develop a framework (or frameworks) to train and qualify competent schedulers will mean in the next year or two there will be enough good schedulers to meet the demand from business and industry. For more on this see: Should you certify your schedulers?  and watch this space…. There are a number of announcements due in the next couple of weeks.

PMOZ becomes a Not For Profit foundation

Starting with the 2012 PMOZ conference that will be run in Melbourne from August 14th to 16th, the profits from the conference will be invested in developing the project management profession in Australia through the PM Global Foundation.

Mosaic has been a long term support of PMOZ as an independent, cross-industry conference that allows delegates to tap into the best new thinking from all sources. We are confident this new initiative will further enhance both the independence and the value of the conference and look forward to continuing our support.

For additional information, down load the PM Global press release.

Lessons Learned

The London Olympic Delivery Authority’s Learning Legacy is designed to facilitate the dissemination of the lessons learned from the London 2012 construction project for the benefit of future projects and programmes, academia and government with the intention of raising the bar within the construction sector.

The ODA are on the verge of delivering a massive program of works on-time and on-budget, the learning from this major undertaking can benefit everyone.  To browse and download the 250 documents see: http://learninglegacy.london2012.com/

There are four types of reports:

    • Micro reports: Short examples of lessons learned, best practice and innovations from the construction programme.
    • Case studies: Peer reviewed papers on lessons learned, best practice and innovations from across the Programme.
    • Research summaries: Summary reports of research projects undertaken by academia and industry on the London 2012 construction.  These organisations will also publish full research papers as they are finalised throughout 2012.   Over 600 interviews were undertaken by researchers on the ODA and its supply chain as part of the learning legacy research.
    • Champion products: Examples of tools and templates used successfully on the programme.

    The reports have been classified into 10 themes:

  • Programme and project management;
  • Design and engineering innovation
  • Equality, inclusion, employment and skills;
  • Health and safety;
  • Masterplanning and town planning;
  • Procurement and supply chain management;
  • Sustainability;
  • Systems and technology;
  • Transport;
  • Archaeology.

This is a highly recommended rich source of information.

It is OK to ask for help

Far too many people think that asking for help is a sign of failure or weakness. In fact the opposite is true. If you don’t know something and waste your time trying to find out, or worse still make an expensive mistake, no-one benefits least of all you! Effective leaders, managers and team members know what they don’t know and proactively seek help to build their knowledge and capability.

Most people seem happy to offer help when someone asks for it, but are shy or embarrassed to ask for help themselves. Rather than asking, they try to work out the answer, even when it’s clear that it is not possible; or hide and not tell anyone they’re wrestling with something; or just hope it goes away. By asking for information or help, rather than wasting time and energy trying to solve the problem, you move forward and the energy that was being wasted wondering and struggling can be used for positive purposes.

This will make you a better leader and will also show those under you that it’s OK to ask for help. Demonstrating to your team that you ask for help when needed encourages them to do the same and frees up communication, energy and the flow of information in a positive way. It seems obvious, but it won’t happen without a push in the right direction.

Things you can do:

  1. First, stop talking to yourself and decide that you are going to talk to someone else.
  2. Decide who that will be.
  3. Craft the conversation. Write down not only what you are going to ask them, but how you hope they will respond. The art of asking effective questions is outlined in our White Paper: Active Listening & Effective Questions
  4. Schedule a meeting and promise you will ask them for help.
  5. Tell someone of your intentions; someone who will hold you to account for having the meeting and asking for help.

Then be pleasantly surprised; most people are honoured to be asked to assist friends and colleagues – by asking for help you are showing them you respect their knowledge and abilities.