Monday

Monthly Archives: October 2012

The role of Oration in Communication – a lost art?

The core purpose of communication is to elicit a change in perceptions, understanding or behaviour in the receiver; this is particularly true of communication with your team members. But if you want a person to remember or respond to the contents of the message, the first essential is for the message you are communicating to be ‘received’ – far too many messages are simply ignored because the sender is perceived as ‘boring’ or the message is seen as repetition of the same old information.

Effective written communication is a skill that is still appreciated and used by a range of professionals. How to write effectively is outlined in our White Paper WP1010 – Writing Skills and page layout is discussed in WP1065. However, you need to apply a completely different set of skills and re-structure the information if you want to communicate the same message verbally, this is the art of ‘oration’.

The Ancient Greeks developed the art of oratory over 2000 years ago. In classical Greece and Rome, the main component was rhetoric (that is, composition and delivery of speeches), and was an important skill in public and private life. Good orators are able to change the emotions of their listeners, not just inform them.

The ancient art of oration is still an important skill to acquire even when you have access to powerpoint or are only speaking to one or two people. The challenge of effective oral communication is staying on message (mixed messages don’t help anyone) whilst changing your style and rhythm to avoid becoming boring……

Great communicators use a similar approach to great music. It does not matter if you listen to Beethoven’s 5th or one of my favourites, Queen’s ‘Bohemian Rhapsody’ you find consistency and variety in the same piece. Patches of high intensity contrasted with quieter movements within a memorable and complete masterpiece.

The same effect can be achieved in your communication by balancing positive and negative elements of a message or changing the direction of the information flow, for example:

  • If you want someone to stop an undesirable behaviour certainly point out the problem (a negative) but also highlight the benefits of the change you want to occur (the positive).
  • Rather then just telling the team they are behind schedule change the direction of the information flow and ask then for ideas to regain the lost time.

The message can be consistent but the variety leads to engagement, the other key element is to finish on a high – great music does not fade away, it builds to a crescendo!

Really great communicators such as, Martin Luther King, Winston Churchill, JFK and others all had a consistent heartfelt message they wanted to communicate in a way that would create a strong reaction in their listeners, all had very different speaking styles, but each had a real sense of rhythm and performance. Read any of their great speeches and you can see the words are carefully crafted for effect, but when you listen to the speech, the presentation adds enormous weight to the message.

Whilst you may never need to ‘fight on the landing fields’ or ‘have a dream’ to change a nation, taking the time to think through how you will present the information in your communication in a way that is engaging and memorable will help you be more effective in literally getting your message across to your audience.

Rhetorical devices
Effective communicators use a range of devices to increase the resonance of their message, some of the more common include:

1. Allusion: an indirect or casual reference to a historical or literary figure, event, or object (but the link has to be understood by the audience).

2. Antiphrasis: the use of a word opposite to its proper meaning; irony. Example: The project manager calmly yelled at his team about the importance of testing!

3. Apophasis: accentuating something by denying that it will be mentioned. Example: I won’t even mention that you misspelled the client’s name in the report.

4. Aporia: expressing doubt about an idea, conclusion, or position.

5. Aposiopesis: stopping abruptly and leaving a statement unfinished, giving the impression that the writer or speaker is unwilling or unable to continue. Example: Pat’s behaviour in the meeting made it clear to everyone that he was . . . but we won’t go there.

6. Analogy: a comparison of two things. Metaphors and similes are both types of analogy.

7. Hyperbole: using exaggeration for emphasis or effect; overstatement. Example: If you take the challenge of speaking to the team too seriously, you will surely go mad.

8. Sententia: quoting a maxim or wise saying to apply a general truth to the situation, thereby offering a single statement of general wisdom. Example: Perhaps we should all remember what Stephen King once said, “The road to hell is paved with adverbs.”

9. Pleonasm: using more words than necessary to express an idea.

10. Epizeuxis: the immediate repetition of words for emphasis. Example: The answer to that question is no, no, no, a thousand times no (used a lot by politicians…)

You don’t need to remember the names of these techniques but the concepts can help develop the effectiveness your communication in every circumstance. Formal presentations also need preparation, for more on this see WP1009 – Presentation Skills.

Developing an effective oral communication capability is a skill that requires practice and benefits from pre-planning before you start an important communication. How much time do you spend working on the data in your messages compared to the way you are going to communicate the information?

White Paper Updates

We maintain a collection of White Papers on the Mosaic website focused on elements of project management skills and knowledge. These White Papers are freely available for downloading and use under the Creative Common’s licence.

Over the last month we have augmented and added to the collection including:

Adding:
WP 1086 – The value of standard operating procedures
WP 1085 – Root Cause Analysis

Augmenting and updating:
WP1045 – Methodologies
WP1024 – Negotiating
WP1081 – Earned Value formulae
WP1004 – Lessons Learned

The full list of White Papers in number order is at: http://www.mosaicprojects.com.au/WhitePapers.html

Possibly more useful is our PM Knowledge Index that sorts the White Papers and other publications by topic based on the PMBOK® Guide index structure: http://www.mosaicprojects.com.au/PM-Knowledge_Index.html

PMBOK 5th Edition some key changes #1

We are starting work on the updates to our training courses (for the change dates see: Examination Updates) and rather like most of the enhancements in the 5th Edition (due for publication on 31st December). Over the next few months we will be posting a number of commentaries on the changes and improvements. This post looks at some of the key changes.

The new PMBOK® guide now has 47 processes (up from 42) and a new Knowledge Area:

Four planning processes have been added: Plan Scope Management (back from the 3rd Edition), Plan Schedule Management, Plan Cost Management, and Plan Stakeholder Management. This change provides clearer guidance for the concept that each major Knowledge Area has a need for the project team to actively think through how the related processes will be planned and managed, and that each of the subsidiary plans are integrated through the overall project management plan, which is the major planning document for guiding further project planning and execution.

The addition of a new knowledge area called ‘Stakeholder Management’ has been created making 10 Knowledge areas. In keeping with the evolution of thinking regarding stakeholder management within projects, this new Knowledge Area has been added addressing Project Stakeholder Management. Information on stakeholder identification and managing stakeholder expectations has been moved from Project Communications Management to this new Knowledge Area to expand upon and increase the focus on the importance of appropriately engaging project stakeholders in the key decisions and activities associated with the project. New processes were added for Plan Stakeholder Management and Control Stakeholder Engagement. We will be discussing this important initiative in later posts.

Data flows and knowledge management concepts have been enhanced:

The PMBOK® Guide now conforms to the DIKW (data, information, knowledge, wisdom) model used in the field of Knowledge Management. Information/Data is segregated into three phases:

Work Performance Data. The raw observations and measurements identified during the performance of the project work, such as measuring the percent of work physically completed.

Work Performance Information. The results from the analysis of the performance data, integrated across areas such as the implementation status of change requests, or forecasts to complete.

Work Performance Reports. The physical or electronic representation of work performance information compiled in project documents, intended to generate decisions, actions, or awareness.

Understanding the information in the reports and making wise decisions are functions of the competence of the individual manager reading the report and are therefore beyond the scope of a process (for more on effective communication visit our PM Knowledge Index )

Annex A1 – The Standard for Project Management of a Project created.

This new annex has been designed to serve as a standalone document. This positions the Standard for Project Management away from the main body of the PMBOK® Guide material allowing the evolution of the Body of Knowledge material to be separated from the actual Standard for Project Management. Chapter 3 remains as the bridge between Sections 1 and 2 and the Knowledge Area sections and introduces the project management processes and Process Groups as in the previous editions of the PMBOK® Guide.

More on the improvements next time – in the interim, from now onward our daily question will be Tweeted with reference to both the 4th and the 5th Editions of the PMBOK® Guide: see today’s question.

Thoughts on ISO 21500

With ISO 21500 now in the public domain there seems to be a rush of people wanting to make money out of the document, primarily talking about certification and assessment. People proposing these concepts either don’t understand the basics of project management or don’t care, assuming organisations that buy their services are even less informed.

Whilst anyone can offer a certification based on knowledge of the standard, this will be a simple memory test with no real relevance to project management capabilities for the simple reason ISO 21500 set out what needs to be achieved, not how to achieve it.

This is quite different to the PMBOK® Guide and APM BoK, and other bodies of knowledge that contain a substantial amount of useful knowledge and is the key differentiator between a ‘standard’ and a BoK – standards define ‘what’; BoKs demonstrate ‘how’. The actual ‘ANSI standard’ in the PMBOK® Guide is one short chapter in the 4th Edition and an appendix in the 5th Edition. The balance of the 400+ pages in the PMBOK contain useful knowledge, and therefore by definition, are not part of the standard.

Similarly, because ISO21500 it is a standard, it IS NOT a methodology and bears no resemblance to a methodology. Organisations can build their methodology based on a standard but this involves a lot of work. To understand the differences between standards and methodologies see: /2009/04/11/pmbok-v-methodology/ and for more on developing a methodology see: http://www.mosaicprojects.com.au/WhitePapers/WP1045_Methodologies.pdf

Whilst I’m sure someone will be offering certification options for commercial reasons before long. The processes defined in ISO21500 are at a very high level and certifying that someone has for example ‘developed a schedule’ is next to useless (but this is all ISO21500 will support). A valid certification should look at the quality and use of the schedule not the simple fact a piece of paper called a schedule exists! There are valid assessment models available like P3M3 and OPM3 that are designed to assess maturity; for more on these models see: http://www.mosaicprojects.com.au/PM-Knowledge_Index.html#OrgGov5

Just for the record, ISO21500 was not designed to facilitate certification or accreditation; it has been designed to provide an overarching framework to facilitate the alignment of national standards and terminology world-wide. If it achieves this, the standard will enable the standardisation of the practice of project management globally over time and will have achieved its primary design objective.

PMBOK® Guide and Examination Updates

The 5th Edition of the PMBOK® Guide will be published on the 31st December 2012 and PMI will be updating its credential exams in Q3 of 2013. The new examinations for the credentials we offer courses for are:
PMP®         31 July 2013
CAPM®      31 July 2013
PMI-SP®   31 August 2013

Mosaic’s courses will updated during the second quarter of 2013 to prepare trainees for the new examinations.

Root Cause Analysis

Learning lessons from projects is not as simple as you may think! Projects are complex adaptive systems linking people, processes and technology – in this environment, useful answers are rarely simple. Our latest White Paper WP1085 Root Cause Analysis looks at some techniques that may help ‘learn lessons’ and solve problems.

The limitations of root cause analysis

Learning lessons from projects is not as simple as you may think! Projects are complex adaptive systems linking people, processes and technology – in this environment, useful answers are rarely simple.

Certainly when things go wrong stakeholders, almost by default, want a simple explanation of the problem which tends to lead to a search for the ‘root cause’. There are numerous techniques to assist in the process including Ishikawa (fishbone) diagrams that look at cause and effect; and Toyota’s ‘Five Whys’ technique which asserts that by asking ‘Why?’ five times, successively, can you delve into a problem deeply enough to understand the ultimate root cause. The chart below outlines a ‘Five Whys’ analysis of the most common paint defect (‘orange peel’ is an uneven finish that looks like the surface of an orange):

These are valuable techniques for understanding the root cause of a problem in simple systems (for more on the processes see WP1085, Root Cause Analysis); however,  in complex systems a different paradigm exists.

Failures in complex socio-technical systems such as a project teams do not have a single root cause. And the assumption that for each specific failure (or success), there is a single unifying event that triggers a chain of other events that leads to the outcome is a myth that deserves to be busted! For more on complexity and complex systems see: A Simple View of ‘Complexity’ in Project Management.

Complex system failures typically emerge from a confluence of conditions and occurrences (elements) that are usually associated with the pursuit of success, but in a particular combination, are able to trigger failure instead. Each element is necessary but they are only jointly sufficient to cause the failure when combined in a specific sequence. Therefore in order to learn from the failure (or success), an approach is needed that considers that:

  • …complex systems involve not only technology but organisational (social, cultural) influences, and those deserve equal (if not more) attention in investigation.
  • …fundamentally surprising results come from behaviours that are emergent. This means they can and do come from components interacting in ways that cannot be predicted.
  • …nonlinear behaviours should be expected. A small change in starting conditions can result in catastrophically large and cascading failures.
  • …human performance and variability are not intrinsically coupled with causes. Terms like ‘situational awareness’ or ‘lack of training’ are blunt concepts that can mask the reasons why it made sense for someone to act in a way that they did with regards to a contributing cause of a failure.
  • …diversity of components and complexity in a system can augment the resilience of a system, not simply bring about vulnerabilities.

This is a far more difficult undertaking that recognises complex systems have emergent behaviours, not resultant ones. There are several systemic accident models available including Hollnagel’s FRAM, Leveson’s STAMP that can help build a practical approach for learning lessons effectively (you can Google these if you are interested…..)

In the meantime, the next time you read or hear a report with a singular root cause, alarms should go off, particularly if the root cause is ‘human error’. If there is only a single root cause, someone has not dug deep enough! But beware; the desire for a simple wrong answer is deeply rooted. The tendency to look for singular root causes comes from the tenets of reductionism that are the basis of Newton physics, scientific management and project management (for more on this see: The Origins of Modern Project Management).

Certainly starting with the outcome and working backwards towards an originally triggering event along a linear chain feels intuitive and the process derives a simple answer that validates our innate hindsight and outcome bias (see WP1069 – The innate effect of Bias). However the requirement for a single answer tends to ignore surrounding circumstances in favour of a cherry-picked list of events and it tends to focus too much on individual components and not enough on the interconnectedness of components Emergent behaviours are driven by the interconnections and most complex system failures are emergent.

This assumption that each presenting symptom has only one cause that can be defined as an answer to the ‘why?’ is the fundamental weakness within a reductionist approach used in the ‘Five Whys’ chart above. The simple answer to each ‘why’ question may not reveal the several jointly sufficient causes that in combination explain the symptom. More sophisticated approached are needed such as the example below dealing with a business problem:

The complexity of the fifth ‘why’ in the table above can be crafted into a lesson that can be learned and implemented to minimise problems in the future but it is not a simple!

The process of gathering ‘lessons learned’ has just got a lot more complex.

The world’s best CPM Conference!

There is only a few days left to secure an ‘early bird’ registration to this year’s Construction CPM conference in New Orleans from January 27 to 30th. Early bird registrations close October 15th.

This event is a unique opportunity to meet most of the world’s CPM though leaders and system developers in the one place and if you fit enough, to party till you drop with the Mardi Gras in full swing at the start of the conference and the Super Bowl following, plus a packed social program for delegates and partners in between.

‘Construction’ in the title is more historical than factual, most of the key conference supporters work across all industries and most of the papers have a very wide application.  We certainly think the conference is worth a 23 hour flight each way…… The question is can you afford to miss this opportunity to hear first hand where Oracle/Primavera, Deltek/Open Plan, ASTA Powerproject, Acumen, NetPoint, Synchro and a host of other thinkers and developers are taking the ‘project controls’ industry over the next few years??

This is not just an opportunity to listen to an excellent range of presentations; you have plenty of opportunity to talk to industry leaders during the conference, during the networking events and at a range of pre and post conference workshops and user meetings.  There’s even the opportunity to present your viewpoint as a speaker!

We are certainly looking forward to starting 2013 with a bang in New Orleans and catching up with friends, colleagues and acquaintances from around the world – if you want to be a part of the action register at: http://www.constructioncpm.com

 

Scheduling Training

Mosaic offers a range of scheduling training options primarily focused on achieving a pass in a specified examination, see: Credential Training  (and you have to pay for these!!)

Murray Woolf, a colleague of many years is offering you an opportunity to study the mechanics of CPM free of charge! All you need to buy is the base text used in the study……

If you don’t thoroughly understand how CPM works, you are at the mercy of you software and most tools get the mechanics wrong to a greater or lesser extent. This is not a simple subject! Our paper on Schedule Calculations took over two years and input from more than a dozen experts (including Murray) to settle on the current assessment of ‘correct’ CPM calculations.

Murray’s book CPM MECHANICS takes this analysis much further and focuses on how the mechanics affect the practice of CPM scheduling. His free symposium (or paid course) uses the book as its foundation text and works through the text to build a deep understanding of our practice.

You can choose between a free study session or a full course for $500 including PDUs – its a ‘free’ choice.

Why are we promoting this course? Simply because our exam prep courses do not go deeply into the mechanics of the CPM process – it is not a requirement of the examination specifications and the courses are focused on getting you through the exam!

But I personally believe developing a CPM schedule without a good understanding of ‘CPM mechanics’ is as dangerous as driving a car with no idea of ‘vehicle mechanics’. You are perfectly OK until something starts to go wrong and then you are helpless. Murray’s course won’t help you change a tyre or fix a fan belt but it will help you understand and fix broken schedules, and more importantly help you avoid getting into trouble in the first place! For more information see: Murray’s Course Information Page

Thoughts on communication

There have been a couple of ‘stories’ in the Australian media of late that suggest a fundamental change in the communication landscape is emerging. One is the ongoing furore around a comment in very bad taste made by radio presenter Alan Jones at a private function organised by a political party, the other concerns perceptions about one of our political leaders. For the purpose of this post, the facts of the two situations are less important than the trends they suggest are emerging.

The Australian government does not try to moderate good taste and within sensible limits around defamation, incitement and vilification we enjoy the privilege of freedom of speech which I believe is critically important; therefore:

Alan Jones has a right to exhibit bad taste and make his comment and the 1000s of other people who are using social media to express their objection to the comment have an equal right to ‘free speech’ and the whinging from the 2GB management (Jones’ radio station) about the effect of the social media campaign on their advertises is also ‘free speech’.

Having said that, what I believe is really interesting is the shift in power that is evident. As a high profile radio presenter, Jones used to have almost complete power, he controlled the microphone, could rubbish detractors on air and cut off their response. That power still remains but has been circumvented by social media; a sustained campaign by the ‘twittering classes’ has cost 2GB hundreds of thousands of dollars in cancelled advertising – a new paradigm for directors and managers to deal with.

In a similar vein, the ongoing ‘noise’ around opposition leader Tony Abbot’s attitude to women will be interesting to watch through to a conclusion, if one is ever reached……

But even at this early stage there are a number of observations that are likely to become increasingly important in an effective stakeholder engagement and communication model for any entity; both individuals and organisations.

  1. Negativity is becoming a very dangerous weapon to deploy. American politicians of all persuasions have been running negative advertising about politicians of the other persuasion for many years. The negative advertising has worked, the America public consistently place politicians at the very bottom of any list based on ethics, trust, etc. Used car salesmen and journalists are preferred to politicians and the situation is not much different in Australia. If you start using negativity, the power of social media to spread the negativity almost guarantees it will come back to damage the initiator. In the connected age, negativity is rapidly becoming a WSD (of similar power to a WMD but read ‘weapon of self destruction’).
  2. Perceptions are easily created and hard to dispel or change. I have no idea how Tony Abbot actually works with women, but a negative perception has emerged. Perceptions are frequently wrong, but they are based on what people believe they saw or heard. Consequently this type of social perception cannot be changed by people with a vested interest telling others they are wrong, to quote Margaret Thatcher “Power is like being a lady… if you have to tell people you are, you aren’t” – the same applies to perceptions. Perceptions can be managed but they are built over time and have to be changed over time and this can only be achieved with a sustained change in observed behaviour – words are not going to do anything.
  3. There seems to be an emerging disconnect between perceptions and emotions and reality. This was the focus of my blog post Credit, Trust and Emotions. What’s not mentioned in the blog, but is in the RBA report, is that non-mining business investment has been increasing rapidly despite the flat business sentiment. The real economic situation and actual investment levels are aligned, but the business sentiment is failing to recognise business reality.

Managing a corporate image, your project’s image within the organisation or your personal image is certainly getting to be a whole lot harder. What I’m wondering based on the above is, are we starting to see a real shift from positional power, supported by negativity and traditional advertising to something more subtle, distributed and potentially positive, and if so how can this be effectively managed?