Governance is an interesting and subtle process which is not helped by confusing governance with management or organisational maturity. A recent discussion in PM World Journal on the subject of governance and management highlighted an interesting issue that we have touched on in the past.

The Romans were undoubtedly good builders (see: The Roman Approach to Contract Risk Management). They also had effective governance and management processes, when a contractor was engaged to build something, they had a clear vision of what they wanted to accomplish; assigned responsibilities and accountability effectively; and failure had clearly understood, significant consequences.

Roman bridge builders were called pontiff. One of the quality control processes used to ensure the effective construction of bridges and other similar structures was to ensure the pontiffs were the first to cross their newly completed construction with their chariots to demonstrate that their product was safe.

An ancient Roman bridge

This governance focus on safety and sanctions created very strong bridges some of which survive in use to the present day but this governance policy also stymied innovation. Roman architecture and engineering practice did not change significantly in the last 400 years of the empire!

No sensible pontiff would risk his life to test an innovative approach to bridge design or construction when the governance systems he operated under focus on avoiding failure. Or in more general terms; the management response to a governance regime focused on ‘no failure’ backed up by the application of sanctions is to implement rigid processes. The problem is rigid process prevents improvement.

To realise the significance of this consider the technology in use in the 17th century compared to the modern day – the vast majority of the innovations that have resulted in today’s improved living standards are the result of learning from failure (see: How to Suffer Successfully).

But the solution is not that simple, we know that well designed and implemented, processes are definitely advantageous. There is a significant body of research that shows implementing methodologies and processes using CMMI, OPM3, PRINCE2, P3M3 and other similar frameworks has a major impact on improving organisational performance and outcomes.

However, organisational maturity is a similar ‘two edged sword’ to rigid governance and management requirements. We know organisational maturity defined as the use of standardised processes and procedures creates significant benefits in terms of reduced error and increased effectiveness compared to laissez-faire / ad hoc systems with little or no standardisation. But these improvements can evolve to become an innovation-sapping straightjacket.

Too much standardisation creates processes paralysis and a focus on doing the process rather than achieving an outcome. In organisations that that have become fixated on ‘process’, it is common to see more and more process introduced to over come the problem of process paralysis which in turn consume more valuable time and resources until Cohn’s Law is proved: The more time you spend in reporting on what you are doing, the less time you have to do anything. Stability is achieved when you spend all your time doing nothing but reporting on the nothing you are doing.

Avoiding this type of paralysis before a review is forced by a major crisis is a subtle, but critical, governance challenge. The governing body sets the moral and ethical ‘tone’ for the organisation, determines strategy and decides what is important. Executive Management’s role is to implement the governing body’s intentions, which includes determining the organisation’s approach to process and methodology, and middle and lower level management’s role is to implement these directives (for more on this see: Governance Systems & Management Systems). The governance challenge is working out a way to implement efficient systems that also encourage an appropriate degree of innovation and experimentation. The ultimate level in CMMI and OPM3 is ‘continuous improvement’. But improvement means change and change requires research, experimentation and risk taking. As Albert Einstein once said, “If we knew what it was we were doing, it would not be called research, would it?”

To stay with the Roman theme of this post: Finis origine pendet (quoting 1st century AD Roman poet and astronomer Marcus Manilius: The end depends upon the beginning). The challenge of effective governance is to encourage flexibility and innovation where this is appropriate (ie, to encourage the taking of appropriate risks to change and improve the organisation) whilst ensuring due process is followed when this is important. The challenge is knowing when each is appropriate and then disseminating this understanding throughout the organisation.

Organisations that follow the Roman approach to governance and avoid taking any form risk are doomed to fade into oblivion sooner or later.

_______________

Note: According to the usual interpretation, the term pontifex literally means “bridge-builder” (pons + facere). The position of bridge-builder was an important one in Rome, where the major bridges were over the Tiber, the sacred river (and a deity). Only prestigious authorities with sacral functions could be allowed to ‘disturb’ it with mechanical additions.

However, the term was always understood in its symbolic sense as well: the pontifices were the ones who smoothed the ‘bridge’ between gods and men. In ancient Rome, the Pontifex Maximus (Latin, literally: greatest pontiff) was the high priest of the College of Pontiffs (Collegium Pontificum), the most important religious role in the republic. The word pontifex later became a term used for bishops in the early Catholic Church and the Bishop of Rome, the Pope, the highest of bridge-builders sumus pontiff.

Cobb’s Paradox

Cobb’s Paradox states, ‘We know why projects fail; we know how to prevent their failure – so why do they still fail?’  PMI has recently published its latest Pulse of the Profession survey which shows some improvements on the 2008 and 2006 results but not much. Nearly half the projects surveyed in 2010 still failed to meet time and cost targets.

However, the PMI survey did highlight a stark difference between high performing organisations with a better than 80% success rate, and low performing organisations with a greater than 40% fail rate. And, the survey also clearly showed the processes typically used by the high performing organisations (and ignored by low performing organisations) are straightforward to implement and use; they include:

  • Using standardised project management processes.
  • Establishing a process to mature project, program and portfolio management practices.
  • Using a process to increase project management competency.
  • Employing qualified project managers.

Most of these elements coalesce around an effective project management office (PMO). Simply by standardising project management processes, the survey shows an organisation can expect a 25% increase in project success.

None of this new is new, KPMG demonstrated exactly the same point in its 2002 and 2003 surveys, supported by similar findings by PwC in 2004 (see: http://www.mosaicprojects.com.au/Resources_Papers.html#Proj_Off).

What’s worrying me is the large number of organisations whose middle and senior management are simply failing their stakeholders by not implementing these simple pragmatic steps. The question that should be asked is WHY?

The stakeholders whose rights are being ignored include the owners who have a right to expect efficient use of resources entrusted to the organisation and the people employed on the failed projects whose work life is made unnecessarily stressful.

As Deeming pointed out in the 1950s, quality is a management responsibility. Therefore, allowing poor quality project management processes to exist in an organisation is a management failure. To quote another mantra: quality is designed in not inspected in. Workers and project managers cannot be expected to retrofit quality into defective systems; systemic failures are a failure of management.

What makes the situation even more worrying is that the tools to develop a quality project management system are readily available. Models such as CMMI, P3M3 and PMI’s OPM3 maturity model has been around for years and are regularly updated.

PMI has recently moved to improve the availability and support for its OPM3 Self-Assessment Module (SAM). This basic assessment system is now sold and supported by organisations such as Mosaic that are qualified to deliver the full range of OPM3 services and help businesses achieve the best return on their investment (for more see: http://www.mosaicprojects.com.au/OPM3.html). OGC have similar arrangements for P3M3 as does CMMI.

So, given the tools are available, the knowledge is available, and the value has been consistently demonstrated; why are organisations still prepared to squander $millions on failed projects rather than investing a fraction of that amount in simple systems that can significantly improve the value they deliver to their stakeholders?
I would be interested to know the answer.